Balconies
- Before
- After
- After 2
- Before
- After
- Balcony Membrane Trafficable Membrane
- Membrane which will be tiled over
- Membrane which will be tiled over
- Before
- Before
- Applying 1st Layer
- 1st Layer Complete
- 2nd Layer Complete
- Completed works with synthetic grass over the top
- Flame bonded membrane on deck
- Before
- After 1st Layer
- After 2nd Layer
- After 2nd Layer
- After tiles removed
- Substrate repaired
- After membrane completed
- After membrane completed
- Timber decking being constructed
- Completed decking
- Completed decking
- Before
- After permanent wire installed
- After
- Balcony area final