Melbourne Exhibition Centre (Jeff’s Shed)

Here we had a concrete roof deck that was leaking so we applied a 2 x layer flame bonded Membrane, then polished stones were placed over the membrane for protection.

Before: Area to be covered with membrane

During: Here we have all the different stages & layers:

  1. Bare Concrete
  2. Black Primer Liquid
  3. 1 x layer diffuser (with holes)
  4. 1 x layer plain 3mm
  5. Stones laid over as to protect from sun

Location:

Melbourne

Products Used

Flame Bonded Bitumen Membrane

Completed:

December-08