Whittlesea Council We were faced with a large fountain that was leaking. It had an existing PVC Membrane which had failed. We removed all of the old membrane and had to grit blast clean the internal side, then applied a 2 x layer Cementitious Flexible Membrane. Location: Whittlesea [...]
Bryn Mawr Bridge
Admin-Allwater2017-07-28T10:36:06+00:00Bryn Mawr Bridge We were asked to fix a problem in which the existing cover plates were deemed to be a trip hazard. The plates were removed and we used a strong quick drying Polyurethane Caulking Compound. Location: Berwick Products Used Polyurethane Caulking Completed: [...]
Victorian College of Arts
Admin-Allwater2017-07-28T10:28:17+00:00Victorian College of Arts We were asked to fix an existing membrane problem that was on top of a dance building that had failed. There were pavers all over the membrane so we removed the pavers and put a 2 x layer Torch Applied Membrane, followed by a Thermal Board for insulation. We [...]
Private Dwelling
Admin-Allwater2017-07-28T10:19:52+00:00Private Dwelling On a new building carpark we were asked for a cost effective solution to stopwater seepage – we used a Liquid Bitumen/Rubber Membrane. Location: Toorak Products Used Liquid Bitumen Membrane Completed: Apr-08
Club Lane
Admin-Allwater2017-07-28T10:15:25+00:00Club Lane We were asked for a solution to stop water leaking through the wall – We therefore used a highly flexible Polyurethane Membrane. Location: C.B.D. Melbourne Products Used Liquid Polyurethane Membrane Completed: Feb-08
Private Dwelling
Admin-Allwater2017-07-28T10:11:01+00:00Private Dwelling We were asked for a product that was highly flexible and strong as these planter boxes were going to hold a lot of weight – we used a Polyurethane Membrane. Location: Park Orchords Products Used Liquid Polyurethane Membrane Completed: Jan-04 [...]
Optus
Admin-Allwater2017-07-28T10:07:35+00:00Optus Optus needed a product on their main computer room floor that was going to seal the concrete and be totally dust free – we used an Epoxy Sealer. Location: Sunshine Products Used Epoxy Floor Sealer Completed: Jun-04
Private Dwelling
Admin-Allwater2017-07-28T10:03:31+00:00Private Dwelling A Liquid Membrane was used here that could be tiled over. Location: Somerville Products Used Liquid Elastomeric Membrane Completed: Dec-03
C.F.A.
Admin-Allwater2017-07-28T10:00:14+00:00C.F.A. The existing gutters were rusting and were asked for a solution that was as least disruptive as possible, so we suggested a Liquid Elastomeric Membrane. Location: Berwick Products Used Liquid Elastomeric Membrane Completed: Apr-03
Private Dwelling
Admin-Allwater2017-07-28T09:52:47+00:00Private Dwelling The deck was leaking and as it is above a bedroom, it had to be sealed. We therefore were able to use a Liquid Membrane. Location: Belgrave Products Used Liquid Elastomeric Membrane Completed: Feb-05